Wow, did they make progress while we were away. And it continues. The roof is on, the siding is started (see shakes in gable picture), the stone guys prepped the area with mesh, rough-ins for plumbing, electrical and hvac are started. I'm hoping that we'll be able to start insulating by the end of the month. Next would be sheet rock.


Front of the house.
The front porch still isn't on
(and the stoop isn't poured),
so you can't really appreciate it yet.


Mudroom door


Great room on left and
dining room on right with
patio doors to our "future" deck


42' from ground to peak
I'm a little nervous about
Maren and Brendan falling
from their bedroom windows.


The shakes are started on the garage.
By today (the 3rd), the front of the
garage is done and the front
smaller gable (over the front door)
are done. They started with the
shakes on the north side of the garage today.